The line on a purchase order may say 500 m per reel. What matters to an installer is whether the reel can deliver the planned uninterrupted run and still leave enough cable for making terminations. Ask the supplier to state how length is measured, the acceptable tolerance and whether the order allows joints. Use those details to schedule pulls and handle differences at receiving.
Work backwards from the longest planned cut
Build an order table with route length, termination allowance and estimated number of complete cuts from each reel format. Compare the shipping weight and drum footprint for two formats against the number of useful cuts. On a job with many shorter extensions cut in a workshop, a different reel size can offer better overall use than the format that suits the longest field pulls.
Agree on traceable length records
Ask a Vietnam factory to identify each reel on a packing list and tie it to the approved marking and metre count. Request details of any metre markers and how their direction is read from the outside end. Where your project has staged installation, ask for reels labelled by route group. That makes the count at receiving meaningful and reduces the risk of consuming a long reel on work intended for a shorter one.
Discuss your cable order with TGS
TGS manufactures power cords and power cables in Vietnam for international buyers. Our team can review the cable build, connector assembly and export packaging together. See our custom cable and harness capabilities if you are sourcing a build to drawing.
Send a factory enquiry for a finished cord or custom build. Use the quotation tool for supported bulk cable sizes. Email ken@tgscable.com, call (+84) 868 848 620 or connect on WhatsApp, Zalo or WeChat.
