A high-performance workstation may have two power numbers in its documentation. One describes what the power supply can deliver to the computer. The mains cord is specified from the input conditions, including operating supply voltage and the equipment’s stated current or cord requirement. The buyer should supply the approved cord configuration from the PSU maker when requesting a replacement.
On a chassis with a cooling shroud over the inlet, measure clearance with the shroud installed. Compare the cord against the validated supply conditions and the actual latch or bracket rather than assuming a lower-profile molding can fit every workstation sold with that PSU.
Check the interface as a complete path
List the workstation inlet and source receptacle along with the specified drawing. A high-input build might change inlet when the power supply changes, so compare the recess and approach before sharing a cord across generations. Verify the assembled lead’s market-specific rating and protective earth arrangement, including the outlet side. Capture those fields in the same records that govern PSU substitutions.
Apply the same check to the finished kit
Once a factory sample arrives, confirm the connection on the intended workstation and an approved outlet or PDU used by the OEM. Ask the Vietnam manufacturer for exact plug and connector part references in the quote. A validation sample should carry the marks and labels that will appear on production packs. Service teams can then select the same cable by build revision and market.
Discuss your cable order with TGS
TGS manufactures power cords and power cables in Vietnam for international buyers. Our team can review the cable build, connector assembly and export packaging together. See our custom cable and harness capabilities if you are sourcing a build to drawing.
Send a factory enquiry for a finished cord or custom build. Use the quotation tool for supported bulk cable sizes. Email ken@tgscable.com, call (+84) 868 848 620 or connect on WhatsApp, Zalo or WeChat.
