A feeder pull can be delayed by one short reel or a missing color even though the rest of the cable arrives on time. Ask the installation contractor for the planned pull groups, usable lengths and site handling constraints before finalizing the order. A factory can then allocate continuous reels by actual use rather than filling every reel to the same standard length.

Make each pull group a purchase unit

Record each conductor’s size, color, required length and minimum extra length for dressing or termination as approved by the project engineer. Include the proposed reel position, destination and sequencing requirement where relevant. Have the engineering team confirm the applicable design rules for the installed parallel conductors. State that continuous length is required if a joint would make a reel unusable.

Give the receiving team a sheet organized by pull group, with the expected gauge, color and ID for each reel. The crew can verify that every conductor for a section has arrived before reserving pulling equipment and clearing the work area.

Review dispatch against the pull sheet

Ask for a reel list with unique IDs, measured length, construction, net and gross weights and approved markings. Agree on label placement that stays readable in the delivered orientation. Put the ordered lot and purchase line on the reel label or packing record. TGS can review a cable RFQ for Vietnam supply using the pull schedule as the packing input.

Discuss your cable order with TGS

TGS manufactures power cords and power cables in Vietnam for international buyers. Our team can review the cable build, connector assembly and export packaging together. See our custom cable and harness capabilities if you are sourcing a build to drawing.

Send a factory enquiry for a finished cord or custom build. Use the quotation tool for supported bulk cable sizes. Email ken@tgscable.com, call (+84) 868 848 620 or connect on WhatsApp, Zalo or WeChat.