The first check on a DC barrel lead is usually whether it slides into the equipment. A connector that feels loose or bottoms out too early can still pass a quick bench check. Field users will expose that mismatch by moving the device or pulling the cable sideways during normal use.

Put mating details on the drawing

Request the equipment maker's connector drawing or approved sample. Record inner and outer contact diameters, exposed length, the mating depth available in the enclosure and polarity. A recessed jack may also need a reduced overmold diameter. Provide pictures of the installed plug and a dimensioned side view so the factory engineer can review the fit on both sides of the connection.

Approve the complete pair

Include your own criteria for insertion, withdrawal and operation when the fitted lead is gently moved under the expected conditions. Check the lead after molding because the finished boot can contact the case before the plug seats. Ask the supplier to record the connector part number on the BOM. For a quote from TGS in Vietnam, submit the plug details, electrical requirements, expected quantity and the equipment revision used to approve the sample.

Discuss your cable order with TGS

TGS manufactures power cords and power cables in Vietnam for international buyers. Our team can review the cable build, connector assembly and export packaging together. See our custom cable and harness capabilities if you are sourcing a build to drawing.

Send a factory enquiry for a finished cord or custom build. Use the quotation tool for supported bulk cable sizes. Email ken@tgscable.com, call (+84) 868 848 620 or connect on WhatsApp, Zalo or WeChat.

TGS CABLE in Yellow Page · TGS Cable In KOMPASS