For a covered entry under the April 2026 metal changes, Section 232 generally applies to the full customs value. The earlier copper-content method can misstate a current estimate for a covered cable assembly. Check the tariff schedule and effective date before using a metal-content percentage in a U.S. cost model.
What should be verified first?
The rule has two separate questions. First determine whether the finished article’s exact classification is listed. Then determine which rate, exception and valuation treatment it qualifies for. A model that starts by multiplying the copper percentage by the duty rate can get both questions wrong.
How should the buyer budget the entry?
A conventional power cord fitted with connectors may fall under 8544.42.90 at 2.6% general duty when its voltage does not exceed 1,000 V. That tariff line appears in the Section 232 copper derivative schedule. In the ordinary 25% treatment under 9903.82.09, for a covered article with at least 15% combined listed copper and aluminum by weight, the subtotal is 27.6%, or $2,760 on $10,000 of customs value. That entry qualifies for the Note 52 exception to the July Section 301 duty. A comparable China-origin cord can reach 52.6% if the separate 25% China duty also applies. Confirm any metal exceptions or China product exclusions before using these figures.
Ask the factory for the real assembly description and any required copper smelt and cast documentation. A terminated 600 V SOOW cord and an otherwise similar bare reel can use different provisions. Run the entry scenario for each before choosing to buy bulk cord or finished assemblies.
What belongs in the order file?
For a live U.S. entry, record the ten-digit product code, the date of entry for consumption or warehouse withdrawal, the basis of the customs value and all applicable additional tariff headings. Have the broker note any legal description or exception used. Treat brokerage, freight and inspection as separate costs, and refresh the estimate before release if the product or entry date changes.
For a comparable offer on SOOW specifications, request a factory quotation for SOOW with the size, reel length, destination and expected shipment date. To compare this case with other electrical cable entries, see the Section 232 and Section 301 for cable.
