The 2026 Section 122 surcharge was a temporary measure scheduled through July 24, 2026. The July Section 301 action for Vietnam is a separate measure that starts on July 24 under its own effective-time rules. A November cable estimate should not carry forward the expired February surcharge as an extra line.

What should be verified first?

A purchase order issued in spring and an entry made in autumn may therefore have different cost sheets. Date the estimates and record the applicable entry or warehouse withdrawal event. Keep the arrival date and estimated filing date visible when the goods cross a policy boundary.

How should the buyer budget the entry?

The U.S. schedule gives HTSUS 8544.49.30 a 5.3% general duty. This is the copper branch for other insulated electric conductors rated above 80 V through 1,000 V and entered without connectors, when no more specific provision applies. Chapter 99 heading 9903.05.84 adds 12.5% for covered goods of Vietnam under the July 2026 Section 301 action. With both duties and no other charge, the subtotal is 17.8%, or $1,780 on $10,000 of customs value. At the same value, a China-origin article under the same line can reach 42.8% if both the 12.5% July action and the separate 25% China Section 301 duty apply. Confirm the China exclusion status against the actual product description and entry date.

Take an old UF-B worksheet and identify the reason for every adjustment. Recalculate using the contemporary rules and check the commodity classification on the actual version delivered. Keep the former estimate in the commercial file for comparison, with its historical date and assumptions.

What belongs in the order file?

For a live U.S. entry, record the ten-digit product code, the date of entry for consumption or warehouse withdrawal, the basis of the customs value and all applicable additional tariff headings. Have the broker note any legal description or exception used. Treat brokerage, freight and inspection as separate costs, and refresh the estimate before release if the product or entry date changes.

For a comparable offer on UF-B specifications, request a factory quotation for UF-B with the size, reel length, destination and expected shipment date. To compare this case with other electrical cable entries, see the U.S. cable duty guide.